Photolog
Dates when pictures were taken are in the form YYYYMMDD.
See documentation for uploading photos.
- Cameca IMS-6F installation
- NEC Accelerator installation
- NEC setup
- Landing in Utah
- Misc
- Recombinator
- Conel Alexander's Visit
- Don's visit
- First grid
- First detection
- LE SS 1 was adjusted to be closed
- Microchannel Plate at HE Center Cup
- First Ion Image at Colutron
- First Ion Recombination
- Ion images for LPSC
- Recombination Image for LPSC
- General Image for LPSC
- Group shot
- Sample chamber and holders
- ESA outer +60kV HV terminal
- NEC Pelletron voltage/charging controller box open
- Emmanuel's Visit
- Kore Multidetector table
- Room Air Control
- Kore Multidetector table: new Faraday cup suppressor
- HE EM connection
- Open accelerator interior to evaluate Ar gas still exists
- Adjust sample-stage height using the jig
- Disassemble Varian RP