Photolog
See documentation for uploading photos.
- Cameca IMS-6F installation
- 20040302: Delivery from Cameca
[O]
- 20040303: Unpacking
[O]
- 20040305: Stored 6F and cabinets in the lab
[O]
- 20040324: Move them to hallway again
[O]
- 20040414: Jose arrival and unpacking 6F
[O]
- 20040415: Removing pallets
[O]
- 20040419: 6F is waiting for power
[O]
- 20040420: 6F got power
[O]
- 20040421: Pri FC collect 10 nA
[O]
- 20040423: ESA detect 1 nA
[O]
- NEC Accelerator installation
- 20040503: NEC parts have been delivered
[C]
- 20040504: Sits on the lab
[O]
- 20040505: Unpacking started
[O]
- 20040506: Removed pallets
[O]
- 20040511: Birds
[O]
- NEC setup
- 20040607: Dunkel brothers again
[O]
[C]
- 20040608: Accelerator opened
[O]
[C]
[DT]
- 20040609: Coupling FC
[C]
- 20040610: Overview
[C]
- 20040612: FC at axial and ESA
[O]
- 20040614: Dunkel Bros. again (3rd)
[O]
[C]
- 20040616: Temporary TP
[C]
- Landing in Utah
- 20040908: View from JPL
[DT]
- 20040908: View from MegaSIMS
[DT]
- Misc
- 20040910: Opened Cameca PBMF
[O]
- Recombinator
- 20040921: Recombinator delivery
[C]
[DT]
- 20040921: Recombinator alignment
[DT]
- Conel Alexander's Visit
- Don's visit
- 20041021: Don meets MegaSIMS first time
[C]
- 20041022: Sample holder
[C]
- First grid
- 20041105: First grid image at Kore
[C]
- First detection
- 20041223: First signal detection at very end
[C]
- LE SS 1 was adjusted to be closed
- Microchannel Plate at HE Center Cup
- First Ion Image at Colutron
- First Ion Recombination
- Ion images for LPSC
- Recombination Image for LPSC
- General Image for LPSC
- Group shot
- Sample chamber and holders
- ESA outer +60kV HV terminal
- NEC Pelletron voltage/charging controller box open
- Emmanuel's Visit
- Kore Multidetector table
- Room Air Control
- Kore Multidetector table: new Faraday cup suppressor
- HE EM connection
- Open accelerator interior to evaluate Ar gas still exists
- Adjust sample-stage height using the jig
- Disassemble Varian RP
megasims at ess.ucla.edu